Latest on the hull

By Dermot Tynan, about 11 years ago.

Here's a quick sneak picture of the hull with the wiring harness complete and the decks sealed in place.

The keel is still only temporarily installed so the main compartment is again flooding with sea water. The bow is still slightly down in comparison to the stern, but this is mostly due to the flooded compartment. Also, the keel still hasn't been moved back, yet. That will happen this week.

  • October 28, 2013
  • |
  • |

Hull

By Dermot Tynan, over 2 years ago.

It's taken an incredibly long time, but Hull #2 is on the verge of being ready for some layers of chopped-strand mat and woven roving. The image above is of the inverted hull, still attached to the strongback. Some layers of thin balsa over ten or eleven stations, and then coated with West Systems filler and epoxy, and faired to a reasonably smooth surface.

  • March 2, 2022
  • |
  • |

Plumbers Have Dripping Taps.

By Dermot Tynan, over 2 years ago.

It's a little bit of a cliche, I admit, and I'm sure a lot of plumbers would object to the stereotype. But I can tell you it's true of network people. We end up with elaborate network configurations in our houses, which are never finished. VLANs for guests, VLANs for servers, multiple WiFi networks, firewalls, and so on. All just a few configuration steps away from perfection! I discovered that this is also true of robotic sailboats.

  • March 8, 2022
  • |
  • |