The keel is attached.
By Dermot Tynan, over 11 years ago.
After much sanding and polishing of the keelson, and the frames for the hatches and top deck, the hull is starting to take shape.
The bulkheads are cut from 6mm exterior grade plywood. The wood which resembles a picture frame is pine, and it is used to hold the bulkheads and transom into a square position, and to provide additional strength to the hull. Eventually those frames will be covered over by 6mm ply on the deck.
Upcoming Missions
- Galway Bay Loop, Waiting for Vessel Availability
Search
Recent Posts
- May 2023 (1 post)
- April 2023 (1 post)
- March 2023 (1 post)
- February 2023 (2 posts)
- March 2022 (3 posts)
- March 2021 (1 post)
- August 2020 (1 post)
- May 2019 (1 post)
- April 2018 (1 post)
- November 2017 (1 post)
- April 2017 (1 post)
- November 2016 (1 post)
- September 2016 (1 post)
- August 2016 (1 post)
- January 2014 (2 posts)
- October 2013 (7 posts)
- September 2013 (1 post)
- August 2013 (3 posts)
- June 2013 (3 posts)
- May 2013 (4 posts)
- April 2013 (3 posts)
- March 2013 (9 posts)
- February 2013 (8 posts)
Tag Cloud
3D Printing, Alix, Alpha, Antigua, ARC, Atmel, Balsa Wood, Battery, Blog, Bulkheads, BVI's, BVI's, Caribbean, Chines, COG, Communications, Compact Flash, Control Board, Corrosion, CSM, DC/DC Converter, DelftSHIP, Electrics, Electronics, English Harbour, Fibreglass, Finish Line, FreeBSD, GPS, GRIB, Guadeloupe, Gybe, Hull, Hull001, Hull002, Hurricane Alley, Hurricane Season, Hurricanes, Igor, Kalopa, Keel, Keelson, Layline, Leeway, Martinique, MaxiMOOP, MegaMOOP, Microtransat, Mission, Mission Control, Montserrat, Mother, NanoBSD, OpenWing, Otto, PID, Polars, Power, PSU, Redis, Round Ireland, Ruby, Rudder, Sails, Satellite, Sea Trials, SGS, Simulations, Snoopy, SOG, Solar, Start Line, Stepper, Team Joker, The Race, Tide, Timetable, Transom, TWA, VMG, VPP, Weather, Weathering, Winds, Wrap Board, XTE